in Framed, you rearrange all these panels, and there’s supposed to be a detective character that’s, like, trying to figure out this crime. And in trying to figure out how to do this, I actually ended up looking like that ‘cause I had, like, all these different things mapped out that I was, like, actually physically pro- paper prototyping and switching around to make sense.So, it looked like I had one of those old timey detective card- uh, corkboards with, like, the - the red lines tacked in things, and I - I thought that was kind of neat.