I play tested it with a lot of people who suffer from depression, as well as therapists and other people who help treat people with depression. Uh, testing it among professionals was super important because not just did I want to make sure that I got the experience right but that I also wasn’t conveying anything harmful. I wanted to make sure that we were doing it ethically. One of these, uh, one of the issues that I had to make sure just personally to not convey through mechanics or not convey through the narrative is the - the thought that medication solves everything. So, making sure that medication is not, uh, necessary for the, uh, the ultimate route, as long as you reach to support networks or are doing something, and making sure that it’s very much optional, and try and show that it doesn’t work for everybody, and that, you know, it’s really sort of a personal thing.