1:47
Most Games are Junk
With every good game or show on television there are several bad ones which can be pleasurable in their own right. However, we must take the whole spectrum of content into account and decide what to watch or to play.
Frank Lantz
Roles:
#Educator
#Game Designer
Related Videos