Wright Bagwell
Wright Bagwell is the CEO and co-founder of Outpost Games. He was the design director of the FARMVILLE franchise at Zynga. Prior to that, he was the creative director at Visceral Games where he worked on the DEAD SPACE series, and was lead game designer at Electronic Arts where he worked on multiple 007 titles.
Featured In