Warren Spector
Warren Spector is a role-playing and video game designer. Over his career, he worked at numerous studios including Origin, Ion Storm and Disney, working on titles such as SYSTEM SHOCK, the ULTIMA series, DEUS EX, and EPIC MICKEY. He founded Junction Point Studios in 2005. In 2016, he had been building a game development program at the University of Texas, when he left to join OtherSide Studios to lead development on SYSTEM SHOCK 3.
Featured In