Ryan Payton
Ryan Payton is a game designer and the founder of the game studio Camouflaj LLC. Prior to founding his studio, he was the HALO 4 creative director at Microsoft and a producer for METAL GEAR SOLID 4 at Konami. In 2013, Camouflaj released the first episode of REPUBLIQUE, an episodic action-adventure stealth video game.
Featured In