Raphael Colantonio
Raphael Colantonio is the president and co-creative director at Arkane Studios. He began his career with Electronic Arts in Europe and played a part in creating the games THEME PARK, SPACE HULK, FIFA SOCCER and EA CRICKET. In 1999 he founded Arkane Studios, which was acquired by ZeniMax Media in 2010. Arkane Studios gained its fame with the RPG ARX FATALIS in 2002, DARK MESSIAH in 2005, BIOSHOCK 2 co-development in 2009 and DISHONORED in 2012.
Featured In