Patrick Miller

Patrick Miller is a game designer at Riot Games, where he was also the senior content editor. Previously, he has been an editor at Game Developer magazine and PC World. He wrote the 2014 book FROM MASHER TO MASTER: THE EDUCATED VIDEO GAME ENTHUSIAST'S FIGHTING GAME PRIMER, a step-by-step guide to the fundamentals of playing competitive fighting games.