Kim McAuliffe

Kim McAuliffe is game designer, programmer and artist who has designed games on multiple platforms for Microsoft, where she worked on PROJECT SPARK, as well as Loot Drop, Zipper Interactive and Griptonite Games. She was the lead designer on the award-winning KINECT NAT GEO TV interactive television project. In 2015 she founded Gamesto.love, LLC, where she is the senior game designer.