Harvey Smith
Harvey Smith is a game designer and writer, who is a partner and co-creative director at Arkane Studios. Previously, Smith worked at studios including Multitude, Ion Storm, and Midway, releasing FIRETEAM, DEUS EX and its sequel DEUS EX: INVISIBLE WAR, and BLACKSITE: AREA 51. In 2012, Arkane released the stealth-action game DISHONORED, which won numerous accolades. He released the novel BIG JACK IS DEAD in 2013.
Featured In