Christofer Sundberg

Christofer Sundberg founded Avalanche Studios in Stockholm, Sweden in 2003 alongside Linus Blomberg. Avalanche Studios focuses on developing open world projects, based on their Avalanche Engine. Prior to founding Avalanche Studios, Sundberg worked in videogame publishing at Paradox Interactive and on language translation for FIFA SOCCER 96 at Electronic Arts.