Alex Hutchinson
Alex Hutchinson is a game developer, writer and creative director. He was creative director for ARMY OF TWO: THE 400TH DAY at Electronic Arts and was the lead designer on SPORE and THE SIMS 2. He is currently a creative director at Ubisoft, where he worked on ASSASSIN'S CREED III and FRY CRY 4.
Featured In